# Test Results on different Real-World Chargers ## ABB Terra 53 Triple Charger Test site: e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Ingolstadt/hagebaumarkt-Siemensstrasse-1/48209/ Test results of version v0.4-7-g7cea8b5 (2022-12-21, Köschinger Forst Ost) - [x] SLAC - [x] SDP - [x] TCP connection - [x] EXI - [x] DIN SupportedApplicationProtocol - [x] DIN SessionSetup - [x] DIN ServiceDiscovery - [x] DIN ServicePaymentSelection - [x] DIN ContractAuthentication - [x] DIN ChargeParameterDiscovery - [x] DIN CableCheck - [x] DIN PreCharge - [x] DIN PowerDelivery Start - [x] DIN CurrentDemand: Light bulb demo works - [x] DIN PowerDelivery Stop - [ ] DIN WeldingDetection no response 2022-12-21T08:50:36.640899, issue 17 - [ ] DIN SessionStop - [x] Inlet voltage measurement ## ABB Terra HPC Test site e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Koesching/Total-Tankstelle-Ruppertswies-6/63794/ Test results of version v0.4-7-g7cea8b5 (2022-12-21) - [x] SLAC - [x] SDP - [x] TCP connection - [x] EXI - [x] DIN SupportedApplicationProtocol - [x] DIN SessionSetup - [x] DIN ServiceDiscovery - [x] DIN ServicePaymentSelection - [x] DIN ContractAuthentication - [x] DIN ChargeParameterDiscovery - [x] DIN CableCheck - [x] DIN PreCharge - [x] DIN PowerDelivery Start - [x] DIN CurrentDemand: Light bulb demo works - [x] DIN PowerDelivery Stop - [ ] DIN WeldingDetection: No response 2022-12-21T08:36:29.943830, issue 17 - [ ] DIN SessionStop - [x] Inlet voltage measurement ## Alpitronic HPC HYC300 Test site: e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Ingolstadt/Dehner-Garten-Center-Degenhartstrasse-Degenhartstrasse-2/71112/ Test results of version v0.4-7-g7cea8b5 (2022-12-21) - [x] SLAC - [x] SDP - [x] TCP connection - [x] EXI - [x] DIN SupportedApplicationProtocol - [x] DIN SessionSetup - [x] DIN ServiceDiscovery - [x] DIN ServicePaymentSelection - [x] DIN ContractAuthentication - [x] DIN ChargeParameterDiscovery - [x] DIN CableCheck - [x] DIN PreCharge - [x] DIN PowerDelivery Start - [x] DIN CurrentDemand: Light bulb demo works - [x] DIN PowerDelivery Stop - [ ] DIN WeldingDetection: "ResponseCode": "FAILED", issue 17 - [ ] DIN SessionStop: No response - [x] Inlet voltage measurement (shows 500V during cable check, and 230V during precharge) ## Compleo Cito BM 500 Test site: e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Koesching/EDEKA-Ingolstaedter-Strasse-114/62619/ Test results of version v0.4 - [x] SLAC - [x] SDP - [x] TCP connection - [x] EXI - [x] DIN SupportedApplicationProtocol - [x] DIN SessionSetup - [x] DIN ServiceDiscovery - [x] DIN ServicePaymentSelection - [x] DIN ContractAuthentication - [x] DIN ChargeParameterDiscovery - [x] DIN CableCheck (10s loop ongoing, then finished OK) - [x] DIN PreCharge ok, but at the end the state machine runs into timeout. Issue 15. - [ ] DIN PowerDelivery, CurrentDemand ## Efacec QC45 Triple Charger Test site e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Hepberg/Koeschinger-Forst-West-A9/15982/ Test results of version v0.4-7-g7cea8b5 (2022-12-21) - [x] SLAC - [x] SDP - [x] TCP connection - [x] EXI - [x] DIN SupportedApplicationProtocol - [x] DIN SessionSetup - [x] DIN ServiceDiscovery - [x] DIN ServicePaymentSelection - [ ] DIN ContractAuthentication: Due to defective charger, no authorization possible via app or RFID. ## Efacec HPC Efapower Kiosk HV175 Test site e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Neufahrn-bei-Freising/Fuerholzen-West-A9/22771/ Test tbd ## Ionity Tritium Veefil-PK Test site: e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Hepberg/IONITY-Koeschinger-Forst-Ost-A9/37875/ Test results of version v0.4-7-g7cea8b5 - [x] SLAC - [x] SDP - [x] TCP connection - [x] EXI - [x] DIN SupportedApplicationProtocol - [x] DIN SessionSetup - [x] DIN ServiceDiscovery - [x] DIN ServicePaymentSelection - [x] DIN ContractAuthentication - [x] DIN ChargeParameterDiscovery - [x] DIN CableCheck - [x] DIN PreCharge - [x] DIN PowerDelivery Start - [ ] DIN CurrentDemand: With the light-bulb configuration, the charger overshoots the intended voltage, because no load is connected at the start of the charging loop. Then, after a few seconds, the charger stops. - [ ] DIN PowerDelivery Stop - [ ] DIN WeldingDetection - [ ] DIN SessionStop - [x] Inlet voltage measurement ## Porsche Test site e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Ingolstadt/Audi-Forum-Ettinger-Strasse/7970/ Test results tbd ## Tesla Supercharger V3 Test site e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Koesching/Supercharger-Car-Wash-Ruppertswies-4/69557/ or https://www.goingelectric.de/stromtankstellen/Deutschland/Pfaffenhofen-an-der-Ilm/Supercharger-Hotel-Strasshof-Siebenecken-1/44134/ Test results of version v0.5-12-g23b1384, on 2023-03-02 - [x] SLAC - [x] SDP - [x] TCP connection - [x] EXI - [x] DIN SupportedApplicationProtocol - [x] DIN SessionSetup - [x] DIN ServiceDiscovery - [x] DIN ServicePaymentSelection - [x] DIN ContractAuthentication - [x] DIN ChargeParameterDiscovery - [ ] DIN CableCheck: The cable check runs into timeout. No real voltage on the pins. Maybe caused by wrong sessionId, see issue 18. - [ ] DIN PreCharge - [ ] DIN PowerDelivery Start - [ ] DIN CurrentDemand - [ ] DIN PowerDelivery Stop - [ ] DIN WeldingDetection - [ ] DIN SessionStop