pyPLC/doc/charger_test_results.md

152 lines
4.8 KiB
Markdown

# Test Results on different Real-World Chargers
## ABB Terra 53 Triple Charger
Test site: e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Ingolstadt/hagebaumarkt-Siemensstrasse-1/48209/
Test results of version v0.4-7-g7cea8b5 (2022-12-21, Köschinger Forst Ost)
- [x] SLAC
- [x] SDP
- [x] TCP connection
- [x] EXI
- [x] DIN SupportedApplicationProtocol
- [x] DIN SessionSetup
- [x] DIN ServiceDiscovery
- [x] DIN ServicePaymentSelection
- [x] DIN ContractAuthentication
- [x] DIN ChargeParameterDiscovery
- [x] DIN CableCheck
- [x] DIN PreCharge
- [x] DIN PowerDelivery Start
- [x] DIN CurrentDemand: Light bulb demo works
- [x] DIN PowerDelivery Stop
- [ ] DIN WeldingDetection no response 2022-12-21T08:50:36.640899, issue 17
- [ ] DIN SessionStop
- [x] Inlet voltage measurement
## ABB Terra HPC
Test site e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Koesching/Total-Tankstelle-Ruppertswies-6/63794/
Test results of version v0.4-7-g7cea8b5 (2022-12-21)
- [x] SLAC
- [x] SDP
- [x] TCP connection
- [x] EXI
- [x] DIN SupportedApplicationProtocol
- [x] DIN SessionSetup
- [x] DIN ServiceDiscovery
- [x] DIN ServicePaymentSelection
- [x] DIN ContractAuthentication
- [x] DIN ChargeParameterDiscovery
- [x] DIN CableCheck
- [x] DIN PreCharge
- [x] DIN PowerDelivery Start
- [x] DIN CurrentDemand: Light bulb demo works
- [x] DIN PowerDelivery Stop
- [ ] DIN WeldingDetection: No response 2022-12-21T08:36:29.943830, issue 17
- [ ] DIN SessionStop
- [x] Inlet voltage measurement
## Alpitronic HPC HYC300
Test site: e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Ingolstadt/Dehner-Garten-Center-Degenhartstrasse-Degenhartstrasse-2/71112/
Test results of version v0.4-7-g7cea8b5 (2022-12-21)
- [x] SLAC
- [x] SDP
- [x] TCP connection
- [x] EXI
- [x] DIN SupportedApplicationProtocol
- [x] DIN SessionSetup
- [x] DIN ServiceDiscovery
- [x] DIN ServicePaymentSelection
- [x] DIN ContractAuthentication
- [x] DIN ChargeParameterDiscovery
- [x] DIN CableCheck
- [x] DIN PreCharge
- [x] DIN PowerDelivery Start
- [x] DIN CurrentDemand: Light bulb demo works
- [x] DIN PowerDelivery Stop
- [ ] DIN WeldingDetection: "ResponseCode": "FAILED", issue 17
- [ ] DIN SessionStop: No response
- [x] Inlet voltage measurement (shows 500V during cable check, and 230V during precharge)
## Compleo Cito BM 500
Test site: e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Koesching/EDEKA-Ingolstaedter-Strasse-114/62619/
Test results of version v0.4
- [x] SLAC
- [x] SDP
- [x] TCP connection
- [x] EXI
- [x] DIN SupportedApplicationProtocol
- [x] DIN SessionSetup
- [x] DIN ServiceDiscovery
- [x] DIN ServicePaymentSelection
- [x] DIN ContractAuthentication
- [x] DIN ChargeParameterDiscovery
- [x] DIN CableCheck (10s loop ongoing, then finished OK)
- [x] DIN PreCharge ok, but at the end the state machine runs into timeout. Issue 15.
- [ ] DIN PowerDelivery, CurrentDemand
## Efacec QC45 Triple Charger
Test site e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Hepberg/Koeschinger-Forst-West-A9/15982/
Test results of version v0.4-7-g7cea8b5 (2022-12-21)
- [x] SLAC
- [x] SDP
- [x] TCP connection
- [x] EXI
- [x] DIN SupportedApplicationProtocol
- [x] DIN SessionSetup
- [x] DIN ServiceDiscovery
- [x] DIN ServicePaymentSelection
- [ ] DIN ContractAuthentication: Due to defective charger, no authorization possible via app or RFID.
## Efacec HPC Efapower Kiosk HV175
Test site e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Neufahrn-bei-Freising/Fuerholzen-West-A9/22771/
Test tbd
## Ionity Tritium Veefil-PK
Test site: e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Hepberg/IONITY-Koeschinger-Forst-Ost-A9/37875/
Test results of version v0.4-7-g7cea8b5
- [x] SLAC
- [x] SDP
- [x] TCP connection
- [x] EXI
- [x] DIN SupportedApplicationProtocol
- [x] DIN SessionSetup
- [x] DIN ServiceDiscovery
- [x] DIN ServicePaymentSelection
- [x] DIN ContractAuthentication
- [x] DIN ChargeParameterDiscovery
- [x] DIN CableCheck
- [x] DIN PreCharge
- [x] DIN PowerDelivery Start
- [ ] DIN CurrentDemand: With the light-bulb configuration, the charger overshoots the intended voltage, because no load is connected at the start of the charging loop. Then, after a few seconds, the charger stops.
- [ ] DIN PowerDelivery Stop
- [ ] DIN WeldingDetection
- [ ] DIN SessionStop
- [x] Inlet voltage measurement
## Porsche
Test site e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Ingolstadt/Audi-Forum-Ettinger-Strasse/7970/
Test results tbd
## Tesla Supercharger V3
Test site e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Koesching/Supercharger-Car-Wash-Ruppertswies-4/69557/
Test results
- [ ] SLAC: fails. It sends SLAC_PARAM_CNF, but nothing more.