pyPLC/doc/charger_test_results.md

192 lines
6.4 KiB
Markdown
Raw Permalink Normal View History

2022-11-30 17:56:35 +00:00
# Test Results on different Real-World Chargers
## ABB Terra 53 Triple Charger
Test site: e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Ingolstadt/hagebaumarkt-Siemensstrasse-1/48209/
Test results of version v0.4-7-g7cea8b5 (2022-12-21, Köschinger Forst Ost)
2022-11-30 17:56:35 +00:00
- [x] SLAC
- [x] SDP
- [x] TCP connection
- [x] EXI
- [x] DIN SupportedApplicationProtocol
- [x] DIN SessionSetup
- [x] DIN ServiceDiscovery
- [x] DIN ServicePaymentSelection
- [x] DIN ContractAuthentication
2022-11-30 17:56:35 +00:00
- [x] DIN ChargeParameterDiscovery
- [x] DIN CableCheck
- [x] DIN PreCharge
- [x] DIN PowerDelivery Start
- [x] DIN CurrentDemand: Light bulb demo works
- [x] DIN PowerDelivery Stop
- [ ] DIN WeldingDetection no response 2022-12-21T08:50:36.640899, issue 17
- [ ] DIN SessionStop
- [x] Inlet voltage measurement
2022-11-30 17:56:35 +00:00
## ABB Terra HPC
Test site e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Koesching/Total-Tankstelle-Ruppertswies-6/63794/
Test results of version v0.4-7-g7cea8b5 (2022-12-21)
- [x] SLAC
- [x] SDP
- [x] TCP connection
- [x] EXI
- [x] DIN SupportedApplicationProtocol
- [x] DIN SessionSetup
- [x] DIN ServiceDiscovery
- [x] DIN ServicePaymentSelection
- [x] DIN ContractAuthentication
- [x] DIN ChargeParameterDiscovery
- [x] DIN CableCheck
- [x] DIN PreCharge
- [x] DIN PowerDelivery Start
- [x] DIN CurrentDemand: Light bulb demo works
- [x] DIN PowerDelivery Stop
- [ ] DIN WeldingDetection: No response 2022-12-21T08:36:29.943830, issue 17
- [ ] DIN SessionStop
- [x] Inlet voltage measurement
2022-11-30 17:56:35 +00:00
## Alpitronic HPC HYC300
Test site: e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Ingolstadt/Dehner-Garten-Center-Degenhartstrasse-Degenhartstrasse-2/71112/
Test results of version v0.4-7-g7cea8b5 (2022-12-21)
2022-11-30 17:56:35 +00:00
- [x] SLAC
- [x] SDP
2022-12-02 12:02:40 +00:00
- [x] TCP connection
- [x] EXI
- [x] DIN SupportedApplicationProtocol
- [x] DIN SessionSetup
- [x] DIN ServiceDiscovery
2022-12-20 11:43:06 +00:00
- [x] DIN ServicePaymentSelection
2022-12-02 12:02:40 +00:00
- [x] DIN ContractAuthentication
2022-12-20 11:43:06 +00:00
- [x] DIN ChargeParameterDiscovery
- [x] DIN CableCheck
- [x] DIN PreCharge
- [x] DIN PowerDelivery Start
- [x] DIN CurrentDemand: Light bulb demo works
- [x] DIN PowerDelivery Stop
- [ ] DIN WeldingDetection: "ResponseCode": "FAILED", issue 17
- [ ] DIN SessionStop: No response
2022-12-20 11:43:06 +00:00
- [x] Inlet voltage measurement (shows 500V during cable check, and 230V during precharge)
2022-11-30 17:56:35 +00:00
## Circontrol
First test negative, see https://openinverter.org/forum/viewtopic.php?p=56268#p56268.
The SLAC works, but after SetKey we do not see the chargers modem.
2022-11-30 17:56:35 +00:00
## Compleo Cito BM 500
Test site: e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Koesching/EDEKA-Ingolstaedter-Strasse-114/62619/
2023-04-19 18:53:03 +00:00
Test results of version v0.7 (2023-04-19)
2022-12-13 20:52:16 +00:00
- [x] SLAC
- [x] SDP
- [x] TCP connection
- [x] EXI
- [x] DIN SupportedApplicationProtocol
- [x] DIN SessionSetup
- [x] DIN ServiceDiscovery
- [x] DIN ServicePaymentSelection
- [x] DIN ContractAuthentication
- [x] DIN ChargeParameterDiscovery
- [x] DIN CableCheck (10s loop ongoing, then finished OK)
2023-04-19 18:53:03 +00:00
- [x] DIN PreCharge
- [x] DIN PowerDelivery
[x] DIN CurrentDemand: With no load and later light bulb connected, the charger has massive problems to regulate the voltage. It shoots over to 400V and later turns off completely, instead of regulating to the target 230V. Log: results/2023-04-19_compleo_pyPlc_lightbulb_failedBadRegulation.pcapng and 2023-04-19_compleo_pyPlc_lightbulb_failedBadRegulation.pcapng.decoded.txt
2022-11-30 17:56:35 +00:00
## Efacec QC45 Triple Charger
Test site e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Hepberg/Koeschinger-Forst-West-A9/15982/
Test results of version v0.4-7-g7cea8b5 (2022-12-21)
- [x] SLAC
- [x] SDP
- [x] TCP connection
- [x] EXI
- [x] DIN SupportedApplicationProtocol
- [x] DIN SessionSetup
- [x] DIN ServiceDiscovery
- [x] DIN ServicePaymentSelection
- [ ] DIN ContractAuthentication: Due to defective charger, no authorization possible via app or RFID.
2022-11-30 17:56:35 +00:00
## Efacec HPC Efapower Kiosk HV175
Test site e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Neufahrn-bei-Freising/Fuerholzen-West-A9/22771/
Test tbd
2022-11-30 17:56:35 +00:00
## Ionity Tritium Veefil-PK
Test site: e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Hepberg/IONITY-Koeschinger-Forst-Ost-A9/37875/
Test results of version v0.4-7-g7cea8b5
- [x] SLAC
- [x] SDP
- [x] TCP connection
- [x] EXI
- [x] DIN SupportedApplicationProtocol
- [x] DIN SessionSetup
- [x] DIN ServiceDiscovery
- [x] DIN ServicePaymentSelection
- [x] DIN ContractAuthentication
- [x] DIN ChargeParameterDiscovery
- [x] DIN CableCheck
- [x] DIN PreCharge
- [x] DIN PowerDelivery Start
- [ ] DIN CurrentDemand: With the light-bulb configuration, the charger overshoots the intended voltage, because no load is connected at the start of the charging loop. Then, after a few seconds, the charger stops.
- [ ] DIN PowerDelivery Stop
- [ ] DIN WeldingDetection
- [ ] DIN SessionStop
- [x] Inlet voltage measurement
2022-11-30 17:56:35 +00:00
2023-05-03 19:44:15 +00:00
## Kempower satellite
Tested by celeron55 with his fork https://github.com/celeron55/pyPLC 2023-05-03.
Charging works, see https://openinverter.org/forum/viewtopic.php?p=56188&sid=9579fd29268d0e332c81ed528f59f09b#p56188
2022-11-30 17:56:35 +00:00
## Porsche
Test site e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Ingolstadt/Audi-Forum-Ettinger-Strasse/7970/
Test results tbd
## Siemens
Charging works, see https://openinverter.org/forum/viewtopic.php?p=56478#p56478
## Tesla Supercharger V2
Charging works, see https://openinverter.org/forum/viewtopic.php?p=56478#p56478
2022-11-30 17:56:35 +00:00
## Tesla Supercharger V3
Test site e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Koesching/Supercharger-Car-Wash-Ruppertswies-4/69557/
2023-03-02 20:32:41 +00:00
or https://www.goingelectric.de/stromtankstellen/Deutschland/Pfaffenhofen-an-der-Ilm/Supercharger-Hotel-Strasshof-Siebenecken-1/44134/
2022-11-30 17:56:35 +00:00
2023-03-02 20:32:41 +00:00
Test results of version v0.5-12-g23b1384, on 2023-03-02
- [x] SLAC
- [x] SDP
- [x] TCP connection
- [x] EXI
- [x] DIN SupportedApplicationProtocol
- [x] DIN SessionSetup
- [x] DIN ServiceDiscovery
- [x] DIN ServicePaymentSelection
- [x] DIN ContractAuthentication
- [x] DIN ChargeParameterDiscovery
- [ ] DIN CableCheck: The cable check runs into timeout. No real voltage on the pins. Maybe caused by wrong sessionId, see issue 18.
- [ ] DIN PreCharge
- [ ] DIN PowerDelivery Start
- [ ] DIN CurrentDemand
- [ ] DIN PowerDelivery Stop
- [ ] DIN WeldingDetection
- [ ] DIN SessionStop
2022-12-01 15:37:41 +00:00
## Tritium 75kW
Charging works, see https://openinverter.org/forum/viewtopic.php?p=56268#p56268