5.4 KiB
Test Results on different Real-World Chargers
ABB Terra 53 Triple Charger
Test site: e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Ingolstadt/hagebaumarkt-Siemensstrasse-1/48209/
Test results of version v0.4-7-g7cea8b5 (2022-12-21, Köschinger Forst Ost)
- SLAC
- SDP
- TCP connection
- EXI
- DIN SupportedApplicationProtocol
- DIN SessionSetup
- DIN ServiceDiscovery
- DIN ServicePaymentSelection
- DIN ContractAuthentication
- DIN ChargeParameterDiscovery
- DIN CableCheck
- DIN PreCharge
- DIN PowerDelivery Start
- DIN CurrentDemand: Light bulb demo works
- DIN PowerDelivery Stop
- DIN WeldingDetection no response 2022-12-21T08:50:36.640899, issue 17
- DIN SessionStop
- Inlet voltage measurement
ABB Terra HPC
Test site e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Koesching/Total-Tankstelle-Ruppertswies-6/63794/
Test results of version v0.4-7-g7cea8b5 (2022-12-21)
- SLAC
- SDP
- TCP connection
- EXI
- DIN SupportedApplicationProtocol
- DIN SessionSetup
- DIN ServiceDiscovery
- DIN ServicePaymentSelection
- DIN ContractAuthentication
- DIN ChargeParameterDiscovery
- DIN CableCheck
- DIN PreCharge
- DIN PowerDelivery Start
- DIN CurrentDemand: Light bulb demo works
- DIN PowerDelivery Stop
- DIN WeldingDetection: No response 2022-12-21T08:36:29.943830, issue 17
- DIN SessionStop
- Inlet voltage measurement
Alpitronic HPC HYC300
Test site: e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Ingolstadt/Dehner-Garten-Center-Degenhartstrasse-Degenhartstrasse-2/71112/
Test results of version v0.4-7-g7cea8b5 (2022-12-21)
- SLAC
- SDP
- TCP connection
- EXI
- DIN SupportedApplicationProtocol
- DIN SessionSetup
- DIN ServiceDiscovery
- DIN ServicePaymentSelection
- DIN ContractAuthentication
- DIN ChargeParameterDiscovery
- DIN CableCheck
- DIN PreCharge
- DIN PowerDelivery Start
- DIN CurrentDemand: Light bulb demo works
- DIN PowerDelivery Stop
- DIN WeldingDetection: "ResponseCode": "FAILED", issue 17
- DIN SessionStop: No response
- Inlet voltage measurement (shows 500V during cable check, and 230V during precharge)
Compleo Cito BM 500
Test site: e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Koesching/EDEKA-Ingolstaedter-Strasse-114/62619/
Test results of version v0.4
- SLAC
- SDP
- TCP connection
- EXI
- DIN SupportedApplicationProtocol
- DIN SessionSetup
- DIN ServiceDiscovery
- DIN ServicePaymentSelection
- DIN ContractAuthentication
- DIN ChargeParameterDiscovery
- DIN CableCheck (10s loop ongoing, then finished OK)
- DIN PreCharge ok, but at the end the state machine runs into timeout. Issue 15.
- DIN PowerDelivery, CurrentDemand
Efacec QC45 Triple Charger
Test site e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Hepberg/Koeschinger-Forst-West-A9/15982/
Test results of version v0.4-7-g7cea8b5 (2022-12-21)
- SLAC
- SDP
- TCP connection
- EXI
- DIN SupportedApplicationProtocol
- DIN SessionSetup
- DIN ServiceDiscovery
- DIN ServicePaymentSelection
- DIN ContractAuthentication: Due to defective charger, no authorization possible via app or RFID.
Efacec HPC Efapower Kiosk HV175
Test site e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Neufahrn-bei-Freising/Fuerholzen-West-A9/22771/
Test tbd
Ionity Tritium Veefil-PK
Test site: e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Hepberg/IONITY-Koeschinger-Forst-Ost-A9/37875/
Test results of version v0.4-7-g7cea8b5
- SLAC
- SDP
- TCP connection
- EXI
- DIN SupportedApplicationProtocol
- DIN SessionSetup
- DIN ServiceDiscovery
- DIN ServicePaymentSelection
- DIN ContractAuthentication
- DIN ChargeParameterDiscovery
- DIN CableCheck
- DIN PreCharge
- DIN PowerDelivery Start
- DIN CurrentDemand: With the light-bulb configuration, the charger overshoots the intended voltage, because no load is connected at the start of the charging loop. Then, after a few seconds, the charger stops.
- DIN PowerDelivery Stop
- DIN WeldingDetection
- DIN SessionStop
- Inlet voltage measurement
Porsche
Test site e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Ingolstadt/Audi-Forum-Ettinger-Strasse/7970/
Test results tbd
Tesla Supercharger V3
Test site e.g. https://www.goingelectric.de/stromtankstellen/Deutschland/Koesching/Supercharger-Car-Wash-Ruppertswies-4/69557/ or https://www.goingelectric.de/stromtankstellen/Deutschland/Pfaffenhofen-an-der-Ilm/Supercharger-Hotel-Strasshof-Siebenecken-1/44134/
Test results of version v0.5-12-g23b1384, on 2023-03-02
- SLAC
- SDP
- TCP connection
- EXI
- DIN SupportedApplicationProtocol
- DIN SessionSetup
- DIN ServiceDiscovery
- DIN ServicePaymentSelection
- DIN ContractAuthentication
- DIN ChargeParameterDiscovery
- DIN CableCheck: The cable check runs into timeout. No real voltage on the pins. Maybe caused by wrong sessionId, see issue 18.
- DIN PreCharge
- DIN PowerDelivery Start
- DIN CurrentDemand
- DIN PowerDelivery Stop
- DIN WeldingDetection
- DIN SessionStop